EMPLOYER ADMINISTRATION :
NUROL inş. ve Tic. A.Ş.
DATE OF CONTRACT and COMPLETION : 01.04.2015 – 30.12.2015
WORK PROPERTIES :
Between Km: 240 + 800 - 244 + 220,1.500.000 m3 Earthworks
EMPLOYER ADMINISTRATION :
YÜKSEL-İLCİ JV.
DATE OF CONTRACT and COMPLETION : 01.08.2013 – 15.08.2014
WORK PROPERTIES :
850m tunnel construction
EMPLOYER ADMINISTRATION :
Başköy Enerji Elektrik Üretim A.Ş.
DATE OF CONTRACT and COMPLETION : 18.03.2015 – 16.11.2016
WORK PROPERTIES :
Kuzey I-II HEPP construction, 1.100m supply and energy tunnel construction
EMPLOYER ADMINISTRATION :
NUROL İnş. ve Tic. A.Ş. + YÜKSEL İnş. A.Ş.+ ÖZKA İnş. A.Ş. + YDA İnş. JV.
DATE OF CONTRACT and COMPLETION : 01.07.2012 – 20.12.2016
WORK PROPERTIES :
7km Highway Tunnel construction and concrete works
EMPLOYER ADMINISTRATION :
SİCİM - YÜKSEL - AKKORD JV.
DATE OF CONTRACT and COMPLETION : 14.08.2015 – 05.12.2016
WORK PROPERTIES :
245 km, Trench Excavation – Bedding – Paddingand Backfillingof the 56’’ Natural Gas Pipeline
EMPLOYER ADMINISTRATION :
Limak İnşaat San. ve Tic. A.Ş.
DATE OF CONTRACT and COMPLETION : 01.01.2018 – 01.01.2020
WORK PROPERTIES :
Gürsöğüt-1 and Gürsöğüt-2 HEPP construction, 1000m water transmission tunnel and 1100m diverison tunnel constructions
EMPLOYER ADMINISTRATION :
Mayes Elektrik Üretim A.Ş.
DATE OF CONTRACT : 16-08-2017
WORK PROPERTIES :
Narlı HEPP Earthworks
EMPLOYER ADMINISTRATION :
Gümüştaş Madencilik ve Tic. A.Ş.
DATE OF CONTRACT : 20-08-2019
WORK PROPERTIES :
56.000.000 ton Mineral (Gold, Silver, Copper and Zinc) Mining with Cut & Fill and Sublevel Caving Methods
EMPLOYER ADMINISTRATION :
POLİN ENERJİ Nak. İnş. Taah. Mad. San. ve Tic. Ltd. Şti.
DATE OF CONTRACT : 01-01-2020
WORK PROPERTIES :
4.000.000 tonIron Ore The field which is the main ore is magnetite, there is a reserve of 3.000.000 tons with a %55 iron (Fe) content. Production planning capacity will be reached 1.000.000 tons/year.
EMPLOYER ADMINISTRATION :
General Directorate of State Water Works (DSI)
DATE OF CONTRACT and COMPLETION : 25.03.1999 - 31.05.2005
WORK PROPERTIES :
115 MW installed capacity, rock-fill dam having an asphalt coated front face.